Tower marker
Tower marker
litian
A tower project, the ground elevation -100, under the skirt of the header pipe elevation EL+2000 (DN250 take over), the elevation of the outlet pipe is a problem ah?
Share Gain Points!
Share to:
Weibo
WeChat
QQ
Facebook
linkedin
Twitter
Print
2017-07-18
Reply
大菁菁
The tower itself is not a problem, but from the point of view of field installation, the elevation is a little low