After solving the standard problem, Zhang Zonggong thought that the factory technical department did not have a designer who was familiar with the external standard, and even did not have a real sense of design engineer, how to solve the bidding stage and project stage? According to his experience in the last company, the factory design of foreign projects is necessary!
&ldquo ” preliminary design; to solve the quotation stage required, but must be done; and the detailed design phase of the project will need a group of people to do the design, Zhang Zonggong believes in the traditional way by the factory recruitment or training are not realistic, but now the cost of personnel has seriously affected the company's benefit then, to recruit a number of designers is not possible, so we need to find a different way.
By logging into the network of &ldquo process equipment; equipment manufacturers work table &rdquo, a chief engineer to; find new solutions. In point entry “ online design ” only can solve the bidding stage required, point in “ offline design ” just a brief introduction to design services. Zhang general can only continue to turn to customer service.
The process of network technology for equipment consultant Zhang chief problems and suggestions are proposed:
1, the preliminary design of the quotation phase, suggest that the factory is equipped with a domestic design experience personnel, through the process equipment network “ preliminary design ” functional modules do
2, the detailed design phase of the project, the proposed factory from the following two scenarios: the first is to choose a way that is a selection of outsourcing, with experience design as the factory design partner, process equipment to registered users of the network there are few such companies, service providers can click on “ ” the search; second individual part-time, choose some personal experience as a factory part-time staff, registered individual process equipment network has a lot of the engineers, &ldquo can search for talent search; “
3, after the single business is really carried out, it is recommended that the factory employ 1 to two full-time design and examination personnel, on the one hand can butt foreign customers, and can be outsourced or part-time design supervision
Zhang Zonggong gives a detailed explanation of the foreign standards and design work of the process equipment net in the time of telling the time to li. Li after listen to very happy, and told Zhang Zonggong that he had let Xiao Zhou contact process equipment, let the other advisers who come to exchange