Beijing's Sindh International Information Consulting Co. Ltd.

Member Level: Register Member
Enterprise Nature: Private
Operation Mode: Service Suppliers
Location: Fengtai District Beijing City China
Authentication Information:

Product Details

Feasibility study report of storage battery project

Price 5000
Unit 咨询公司
Yield /年
Place of Production 北京市丰台区造甲街110号48号楼206室
Product Category 项目技术分析和风险评估
Delivery Time

Product Detail Parameters

Product Description

Outline of the feasibility study report of the storage battery project
Core tip: energy storage project feasibility study report of colloidal battery, energy storage project analysis colloid battery investment environment, storage of background and development projects colloid storage battery storage necessity colloid battery project construction, energy storage project feasibility study report preparation of colloid storage battery, analysis of industry competition colloidal battery energy storage, financial reference the indicators of industry colloid battery storage market analysis, colloid battery industry analysis and the scale of construction, energy storage and location scheme colloid battery construction conditions, storage battery project analysis of colloidal uncertainty and risk analysis of the development trend of energy storage industry colloid storage battery.
[report]: development and Reform Commission approved the project, the record, the government approved the land, corporate finance, project loans, the application of funds, energy assessment, etc.. The other: the national development and Reform Commission a, B and C qualification.
[report]
Storage battery project application report
Storage battery project proposal
Storage battery business plan
Project feasibility study report of storage colloid storage battery
Report on the application of funds for storage battery
Energy storage colloid storage battery project evaluation report
Market Research Report of storage battery industry
Analysis report on the investment value of the storage battery project
Project investment risk analysis report of storage battery
Analysis report on the development of storage battery industry
[contact] Zhang Feng
[telephone] 15905416720 (24 hours)
[network online] QQ:1084122939 (WeChat same number)
[production unit] Beijing's Sindh International Information Consulting Co. Ltd.
[service phone] 010-52785534
[delivery time] 3-5 working days
[form] text analysis, data comparison, statistical chart
[report] WORD format format format PDF fine print edition binding
[report price] this report for the project report, the price according to the specific requirements of consultation, welcome to inquire.
[report]
Beijing's Sindh International Information Consulting Co. Ltd is a professional preparation of all the feasibility study report, business plan, project proposal, project report and so on. After continuous development and improvement, we have covered agriculture, industry, new energy, medical support combined, photovoltaic, aquaculture, industrial park, logistics park, garbage disposal, sewage treatment, big data, technological expansion, construction, metallurgy, chemical, electrical, household appliances, steel and other more than and 40 industries, online sales all kinds of the feasibility report of nearly million copies.
This report is aimed at the special report on the industry investment feasibility research and consulting service, this report is a personalized service report, we will according to the specific requirements of different types and different sectors of the proposed project, revised report directory, and based on this catalog to improve the industry data and content analysis, for the enterprise, the project launched, provide full service to guide capital financing.
The research report based on the market demand and supply of resources, the scale of construction, technological process, equipment selection, environmental impact, financing, profitability and other aspects based on the experience of experts on project economic benefits and social benefits of scientific forecast, to provide customers with a full. Face, objective and reliable project investment value evaluation and project construction process, etc..
Feasibility study report outline (specific to customer requirements)
In Chapter one.
1.1 storage battery project background
1.1.1 storage battery project name
1.1.2 construction property
1.1.3 storage battery project contractor unit
1.1.4 storage battery project construction site
1.1.5 research work basis
1.1.5.1 national policy, industry development planning, regional development planning
Basic information provided by 1.1.5.2 storage battery project unit
1.1.6 research scope
1.2 feasibility study conclusion
1.2.1 market forecast and project size
A brief analysis of 1.2.1.1 market demand
1.2.1.2 target market determination
1.2.1.3 product solutions and sales revenue forecast
1.2.1.4 storage battery project to build the scale of the project
1.2.2 raw materials, fuel and power supply
1.2.3 site
1.2.4 environmental protection
1.2.5 factory organization and personnel work
1.2.6 energy storage battery project construction progress
1.2.7 investment estimate and fund raising
1.2.7.1 investment estimate
1.2.7.2 financing
Financial and economic review of 1.2.8 storage battery project
Comprehensive evaluation results of 1.2.9 energy storage colloid storage battery project
Table 1.3 main technical and economic indicators
Table 1-1 main technical and economic indicators table
The second chapter is the background of the project and the necessity of the investment.
2.1 background of storage battery project
2.1.1 industry policy background
2.1.2 storage battery project background
2.2 the need for investment
The construction of 2.2.1 storage battery project is the need of the market.
2.2.2 storage battery project is the need to increase the local fiscal revenue
2.2.3 storage battery project is to improve the local people's income and maintain social prosperity and stability needs
2.2.4 storage battery project is the need of enterprise's own development
The third chapter market analysis
3.1 overall market trends
3.2 market size
3.3 market forecast
3.4 competitive analysis of products
The fourth chapter construction conditions and site selection
4.1 storage battery project area overview
4.1.1 profile
4.1.2 selection principle
4.1.3 site summary
Brief introduction of 4.1.4 industrial concentration area
4.2 factory (field) site construction conditions
4.2.1 geography. climate
4.2.2 resources overview
4.2.3 traffic location
4.2.4 social and economic conditions
4.3 major raw and auxiliary materials supply
4.3.1 main raw material
4.3.2 fuel power
The fifth chapter engineering technology program
5.1 storage battery project composition
5.2 production technology solutions
5.2.1 technology source
5.2.2 production process
5.3 project plan
5.3.1 civil engineering
5.3.1.1 design codes and standards
5.3.1.2 design principles
5.3.1.3 engineering survey
5.3.1.4 building requirements and effects
5.3.2 plant protection facilities and green
5.3.3 road parking lot
The sixth chapter general transportation and public assistance project
6.1 general layout and transportation
Key points of 6.1.1 general layout plan and description
6.1.1.1 design basis and basic data
The principle of 6.1.1.2 layout
6.1.2 general layout plan
6.2 inside and outside transport
6.2.1 transport volume
6.2.2 means of transport and transport
6.2.2.1 outside the plant transport
6.2.2.2 in plant transportation
6.3 public utilities
6.3.1 water supply and drainage engineering
6.3.1.1 design basis
6.3.1.2 design scope
6.3.1.3 water supply and water use
6.3.1.4 drainage
6.3.2 Electrical Engineering
6.3.2.1 design basis
6.3.2.2 design scope and content
6.3.2.3 load level and the determination of power supply
6.3.2.4 low voltage distribution design
6.3.2.5 lightning protection and electrical safety grounding system
6.3.2.6 integrated wiring system design
6.3.2.7 cable TV system design
6.3.3 HVAC
6.3.4 maintenance
6.3.5 communication facilities
The seventh chapter energy saving
7.1 energy standards and energy efficiency standards
7.1.1 principles and standards
7.1.2 specification and basis
7.2 energy consumption status and energy consumption index analysis
7.3 energy saving measures
7.3.1 building energy efficiency
7.3.2 power saving measures
7.4 water saving measures
The eighth chapter environmental protection
8.1 implementation standards for environmental protection
8.1.1 environmental quality standards
8.1.2 pollutant emission standard
8.2 environmental and ecological status quo
8.3 major pollution sources and pollutants
Influence of 8.3.1 construction period on Environment
8.3.1.1 atmospheric environmental impact analysis
8.3.1.2 water environmental impact analysis
8.3.1.3 sound environment impact analysis
Analysis on the impact of 8.3.1.4 solid waste
Impact of 8.3.2 operation on the environment
8.3.2.1 water environmental impact analysis
8.3.2.2 atmospheric environmental impact analysis
Analysis of the environmental impact of 8.3.2.3 noise
Analysis on the impact of 8.3.2.4 solid waste
8.4 environmental protection measures
Pollution prevention and control measures during the construction period of 8.4.1
Pollution control measures during 8.4.2 operation
8.4.2.1 wastewater treatment program
8.4.2.2 waste gas treatment program
8.4.2.3 noise control scheme
8.4.2.4 solid waste management program
8.4.2.5 plant greening measures
8.5 environmental monitoring and Environmental Protection Agency
8.6 public participation
8.7 environmental impact assessment
Labor safety and health and fire protection in the ninth chapter
9.1 labor safety and health
9.1.1 design basis
9.1.2 labor safety
9.1.2.1 plant layout and transportation safety
9.1.2.2 fire and explosion protection
9.1.2.3 anti machine injury, hurt
9.1.2.4 electrical accident prevention
9.1.2.5 lightning protection and grounding
9.1.3 occupational health
9.1.3.1 anti noise
9.1.3.2 cooling, cold proof and anti temperature
9.1.3.3 reduces labor intensity
9.1.3.4 protection for women workers
9.2 fire safety
Main basis for 9.2.1 design
9.2.2 fire principles and measures
Organization structure and human resource allocation in the tenth chapter
10.1 organization
10.2 human resource allocation
10.2.1 labor force
10.2.2 personnel source
10.2.3 personnel training
10.3 project management
10.3.1 financial management
10.3.2 equipment and material management
10.3.3 Engineering Management
The eleventh chapter is the project management and implementation progress of storage colloid storage battery
11.1 storage colloid storage battery project construction management
11.2 storage battery project supervision
11.3 storage battery project construction schedule and schedule
The twelfth chapter: the project investment estimation and fund raising for storage battery
12.1 investment estimate
12.1.1 basis
12.1.2 preparation method
Total investment in 12.1.3 construction
12.1.3.1 engineering cost
12.1.3.2 other costs of construction projects
12.1.3.3 engineering construction preparation fee
12.1.3.3 construction period interest
12.1.4 liquidity estimates
12.1.4.1 estimate basis
12.1.4.2 estimation results
12.1.5 investment estimation results
12.2 fund raising
12.3 investment plan
12.3.1 investment plan
12.3.2 loan repayment plan
12.4 investment estimate form
See the economic schedule:
Construction investment estimate;
Construction period interest estimate;
Liquidity estimate;
Capital raising and use plan.
The thirteenth chapter of the project tender
13.1 general
13.2 the bidding process for the storage battery project
13.3 bidding content
13.4 basic information of the tender table
The fourteenth chapter is the financial evaluation of the storage battery project
14.1 financial evaluation basis and scope
14.2 basic data and parameter selection
14.3 financial benefit and cost estimate
14.3.1 annual sales revenue estimate
Total cost and cost estimation of 14.3.2 products
14.3.3 profit and profit distribution
14.4 financial analysis
14.4.1 financial profitability analysis
14.4.2 financial viability analysis
14.5 financial solvency analysis
14.6 uncertainty analysis
14.6.1 break even analysis
14.6.2 sensitivity analysis
14.7 financial appraisal conclusion
The fifteenth chapter of storage battery project risk analysis
15.1 identification of risk factors
15.2 risk assessment
15.3 risk countermeasure research
The sixteenth chapter is the conclusion and suggestion of the storage battery project
16.1 storage battery project conclusions
16.2 storage battery project proposal
The seventeenth chapter schedule
Service flow:
1 pre contact with customers, understand the basic situation of the project;
2 the two parties to negotiate a fee, and the signing of the agreementService contract;
3 we keep a secret commitment (or sign a confidentiality agreement), the other party to submit information;
4, we set up a research group, the professional preparation of writing;
5, the delivery of the first draft, customer audit, combined with the improvement of views to improve the treatment;
6, complete the final version and print and bind the follow-up work.
Specific details of the service, please call: 15905416720 (Zhang Jingli