Beijing's Sindh International Information Consulting Co. Ltd.

Member Level: Register Member
Enterprise Nature: Private
Operation Mode: Service Suppliers
Location: Fengtai District Beijing City China
Authentication Information:

Product Details

Project feasibility study of temperature controller

Price 5000
Unit 咨询公司
Yield /年
Place of Production 北京市
Product Category 项目技术分析和风险评估
Delivery Time

Product Detail Parameters

Product Description

Project feasibility study report of temperature controller
Core tip temperature control project feasibility study report, analysis of temperature control project investment environment, overview of the background and development of temperature controller project, the necessity of temperature control project construction, project feasibility study report preparation temperature controller, temperature controller analysis of industry competition pattern, the reference temperature controller industry financial index analysis, the temperature controller and the scale of construction industry market analysis, and location temperature control project construction conditions, uncertainty and risk analysis of temperature controller, temperature controller industry development trend analysis.
[report] to provide development and Reform Commission grade a qualification
Project application report of temperature controller
Project proposal for temperature controller
Temperature controller business plan
Project feasibility study report of temperature controller
Temperature controller project fund application report
Energy saving evaluation report of temperature controller
Temperature controller Industry Market Research Report
Project investment value analysis report of temperature controller
Temperature controller project investment risk analysis report
Temperature controller industry development forecast analysis report
[contact] Zhang Feng
[telephone] 15905416720 (24 hours)
[network online] QQ:1084122939 (WeChat same number)
[production unit] Beijing's Sindh International Information Consulting Co. Ltd.
[service phone] 010-52785534
[delivery time] 3-5 working days
[form] text analysis, data comparison, statistical chart
[report] WORD format format format PDF fine print edition binding
[report price] this report for the project report, the price according to the specific requirements of consultation, welcome to inquire.
[main purposes] NDRC project, the government approved the land, financing, loans, apply for national grant funds, etc..
The other: the national development and Reform Commission a, B and C qualification
[report]
Beijing's Sindh International Information Consulting Co. Ltd. specializes in a variety of research report. After continuous development and improvement, our company has covered the textile, energy, medicine, metallurgy, construction, chemical industry, agriculture, electronics, household appliances, steel and other more than and 40 industries, online sales of various types of the feasibility report of nearly million copies.
This report is aimed at the special report on the industry investment feasibility research and consulting service, this report is a personalized service report, we will according to the specific requirements of different types and different sectors of the proposed project, revised report directory, and based on this catalog to improve the industry data and content analysis, for the enterprise, the project launched, provide full service to guide capital financing.
Investment feasibility report advisory services are divided into government approval with the feasibility study report and financing feasibility study report. The feasibility study report on the approval of the examination and approval of the project focused on the social and economic benefits of the project and the impact of the financial report focused on the economic feasibility of the project. Specifically, government approval, industry support, bank financing, investment, construction investment, overseas investment, financing, foreign cooperation, share cooperation, company formation, feasibility report, various types of land requisition for high-tech enterprises.
The research report based on the market demand and supply of resources, the scale of construction, technological process, equipment selection, environmental impact, financing, profitability and other aspects based on the experience of experts on project economic benefits and social benefits of scientific forecast, to provide customers with a full. Face, objective and reliable project investment value evaluation and project construction process, etc..
Feasibility study report outline (specific to customer requirements)
In Chapter one.
1.1 temperature controller project background
1.1.1 temperature controller project name
1.1.2 construction property
1.1.3 temperature controller project contractor
1.1.4 temperature controller project construction site
1.1.5 research work basis
1.1.5.1 national policy, industry development planning, regional development planning
1.1.5.2 temperature controller project units to provide basic information
1.1.6 research scope
1.2 feasibility study conclusion
1.2.1 market forecast and project size
A brief analysis of 1.2.1.1 market demand
1.2.1.2 target market determination
1.2.1.3 product solutions and sales revenue forecast
1.2.1.4 temperature controller project proposed scale
1.2.2 raw materials, fuel and power supply
1.2.3 site
1.2.4 environmental protection
1.2.5 factory organization and personnel work
1.2.6 temperature controller project progress
1.2.7 investment estimate and fund raising
1.2.7.1 investment estimate
1.2.7.2 financing
1.2.8 temperature controller project financial and Economic Review
1.2.9 temperature controller project comprehensive evaluation conclusion
Table 1.3 main technical and economic indicators
Table 1-1 main technical and economic indicators table
The second chapter is the background of the project and the necessity of the investment.
2.1 the background of the project of temperature controller
2.1.1 industry policy background
2.1.2 temperature controller project background
2.2 the need for investment
2.2.1 temperature controller project construction is the need of the market
2.2.2 temperature controller project is required to increase local fiscal revenue
2.2.3 temperature controller project is to improve the local people's income and maintain social prosperity and stability of the needs of
2.2.4 temperature controller project is the need of enterprise's own development
The third chapter market analysis
3.1 overall market trends
3.2 market size
3.3 market forecast
3.4 competitive analysis of products
The fourth chapter construction conditions and site selection
4.1 temperature controller project area
4.1.1 profile
4.1.2 selection principle
4.1.3 site summary
Brief introduction of 4.1.4 industrial concentration area
4.2 factory (field) site construction conditions
4.2.1 geography. climate
4.2.2 resources overview
4.2.3 traffic location
4.2.4 social and economic conditions
4.3 major raw and auxiliary materials supply
4.3.1 main raw material
4.3.2 fuel power
The fifth chapter engineering technology program
5.1 temperature controller project
5.2 production technology solutions
5.2.1 TechnologySource of operation
5.2.2 production process
5.3 project plan
5.3.1 civil engineering
5.3.1.1 design specifications and standards
5.3.1.2 design principles
5.3.1.3 engineering survey
5.3.1.4 building requirements and effects
5.3.2 plant protection facilities and green
5.3.3 road parking lot
The sixth chapter general transportation and public assistance project
6.1 general layout and transportation
Key points of 6.1.1 general layout plan and description
6.1.1.1 design basis and basic data
The principle of 6.1.1.2 layout
6.1.2 general layout plan
6.2 inside and outside transport
6.2.1 transport volume
6.2.2 means of transport and transport
6.2.2.1 outside the plant transport
6.2.2.2 in plant transportation
6.3 public utilities
6.3.1 water supply and drainage engineering
6.3.1.1 design basis
6.3.1.2 design scope
6.3.1.3 water supply and water use
6.3.1.4 drainage
6.3.2 Electrical Engineering
6.3.2.1 design basis
6.3.2.2 design scope and content
6.3.2.3 load level and the determination of power supply
6.3.2.4 low voltage distribution design
6.3.2.5 lightning protection and electrical safety grounding system
6.3.2.6 integrated wiring system design
6.3.2.7 cable TV system design
6.3.3 HVAC
6.3.4 maintenance
6.3.5 communication facilities
The seventh chapter energy saving
7.1 energy standards and energy efficiency standards
7.1.1 principles and standards
7.1.2 specification and basis
7.2 energy consumption status and energy consumption index analysis
7.3 energy saving measures
7.3.1 building energy efficiency
7.3.2 power saving measures
7.4 water saving measures
The eighth chapter environmental protection
8.1 implementation standards for environmental protection
8.1.1 environmental quality standards
8.1.2 pollutant emission standard
8.2 environmental and ecological status quo
8.3 major pollution sources and pollutants
Influence of 8.3.1 construction period on Environment
8.3.1.1 atmospheric environmental impact analysis
8.3.1.2 water environmental impact analysis
8.3.1.3 sound environment impact analysis
Analysis on the impact of 8.3.1.4 solid waste
Impact of 8.3.2 operation on the environment
8.3.2.1 water environmental impact analysis
8.3.2.2 atmospheric environmental impact analysis
Analysis of the environmental impact of 8.3.2.3 noise
Analysis on the impact of 8.3.2.4 solid waste
8.4 environmental protection measures
Pollution prevention and control measures during the construction period of 8.4.1
Pollution control measures during 8.4.2 operation
8.4.2.1 wastewater treatment program
8.4.2.2 waste gas treatment program
8.4.2.3 noise control scheme
8.4.2.4 solid waste management program
8.4.2.5 plant greening measures
8.5 environmental monitoring and Environmental Protection Agency
8.6 public participation
8.7 environmental impact assessment
Labor safety and health and fire protection in the ninth chapter
9.1 labor safety and health
9.1.1 design basis
9.1.2 labor safety
9.1.2.1 plant layout and transportation safety
9.1.2.2 fire and explosion protection
9.1.2.3 anti machine injury, hurt
9.1.2.4 electrical accident prevention
9.1.2.5 lightning protection and grounding
9.1.3 occupational health
9.1.3.1 anti noise
9.1.3.2 cooling, cold proof and anti temperature
9.1.3.3 reduces labor intensity
9.1.3.4 protection for women workers
9.2 fire safety
Main basis for 9.2.1 design
9.2.2 fire principles and measures
Organization structure and human resource allocation in the tenth chapter
10.1 organization
10.2 human resource allocation
10.2.1 labor force
10.2.2 personnel source
10.2.3 personnel training
10.3 project management
10.3.1 financial management
10.3.2 equipment and material management
10.3.3 Engineering Management
Eleventh chapter temperature controller project management and implementation progress
11.1 temperature controller project construction management
11.2 temperature controller project supervision
11.3 temperature controller project construction schedule and schedule
Twelfth chapter temperature controller project investment estimation and fund raising
12.1 investment estimate
12.1.1 basis
12.1.2 preparation method
Total investment in 12.1.3 construction
12.1.3.1 engineering cost
12.1.3.2 other costs of construction projects
12.1.3.3 engineering construction preparation fee
12.1.3.3 construction period interest
12.1.4 liquidity estimates
12.1.4.1 estimate basis
12.1.4.2 estimation results
12.1.5 investment estimation results
12.2 fund raising
12.3 investment plan
12.3.1 investment plan
12.3.2 loan repayment plan
12.4 investment estimate form
See the economic schedule:
Construction investment estimate;
Construction period interest estimate;
Liquidity estimate;
Capital raising and use plan.
The thirteenth chapter of the project tender
13.1 general
13.2 temperature controller project using the bidding process
13.3 bidding content
13.4 basic information of the tender table
The fourteenth chapter temperature controller project financial evaluation
14.1 financial evaluation basis and scope
14.2 basic data and parameter selection
14.3 financial benefit and cost estimate
14.3.1 annual sales revenue estimate
Total cost and cost estimation of 14.3.2 products
14.3.3 profit and profit distribution
14.4 financial analysis
14.4.1 financial profitability analysis
14.4.2 financial viability analysis
14.5 financial solvency analysis
14.6 uncertainty analysis
14.6.1 break even analysis
14.6.2 sensitivity analysis
14.7 financial appraisal conclusion
The fifteenth chapter temperature controller project risk analysis
15.1 identification of risk factors
15.2 risk assessment
15.3 risk countermeasure research
The sixteenth chapter is the conclusion and suggestion of the temperature controller project.
16.1 temperature controller project conclusion
16.2 temperature controller project proposal
The seventeenth chapter schedule
Service flow:
1 pre contact with customers, understand the basic situation of the project;
TwoBoth sides negotiate report preparation fee, and sign the business contract;
3 we keep a secret commitment (or sign a confidentiality agreement), the other party to submit information;
4, we set up a research group, the professional preparation of writing;
5, the delivery of the first draft, customer audit, combined with the improvement of views to improve the treatment;
6, complete the final version and print and bind the follow-up work.
Specific details of the service, please call: 15905416720 (Zhang Jingli