Red of botou city environmental protection equipment manufacturing co., LTD

Member Level: Register Member
Enterprise Nature: Private
Operation Mode: Fabricators
Location: Botou Cangzhou City Hebei Province China
Authentication Information:

Product Details

Coal powder grinding machine lining board (side tile) installation step

Price 2000
Unit
Yield 3000/年
Place of Production 河北省泊头市郝村镇
Product Category 其他
Delivery Time 2天

Product Detail Parameters

重量3、1000 燃煤要求5000大卡

Product Description

Coal powder grinding machine lining board (side tile) installation steps:
Coal powder barrel lining board according to the scene situation in turn Jane approach. In the assembly, but also in the rotary drum is in installation position on the group of people
Installed.
The workload of the lining board is larger, so the book should first understand the connection plate and the fixing method, and the installation procedure and the fixing method of the towel and the plate are installed in the installation process.
A full twist. Especially for tapered drum plates. Its size is more than and 10, should prevent wrong rework.
(1) in general, the bag should be first turned on both ends of the end cover plate and then install the lining plate. In the lining between the plate along the longitudinal there is a row of change of the shape of the lining (compression wedge) as shown in Figure 16.
0 in two rows. The two row of fixed pressure entangles the Australian chess. Fixed on the barrel through the grab. Other health liners were not on wire connections just two dimensional adjacent smell shape
The shape of dovetail form concave convex edge. (figure and pressure wedge chess to squeeze the basket, which are located in the same circle of the liner plate in circumferential direction from the extrusion is tight.
And get fixed '
(2) liner material for high manganese in each key basin A 50-100 mask cone type lining plate. The tolerance to 180~300kg access to a block of lining board
The hollow shaft hole is carried through the hollow shaft hole to carry out the arrangement and installation of the rotary shaft, and is a very basket heavy work.
Simple bu. In the construction safety but some measures should be taken. As figure 16^19 Beijing for the transport board. The method of Jun village to install a single beam or overhead
Key of wire rope. Through the hollow drum. Two Laura pumping, two fixed in the construction field specialized service bracket. In single beam Huoli with rope with hook area
Small Fen car
The cold car can pull through the hollow shaft to pull into the pull out, pass through the lining Syria, the village board, through the central hook or on the lining board in the temporary use of 1F shirt RA eye steel
The small lug (should not hinder lining in a fat pillow position immediately after knocked off) to lift the body. Also in the West. But to a short beam delay