Feasibility study of wind power generation equipment project

Price 5000
Unit 咨询公司
Yield /年
Place of Production 北京市丰台区造甲街110号48号楼206室
Product Category 项目技术分析和风险评估
Delivery Time

Product Detail Parameters

Product Description

Outline of project feasibility study report of wind power generation equipment
Core tip: project feasibility study report of wind power generation equipment, analysis equipment of wind power project investment environment, background and development of wind power project equipment, project construction necessity of wind power generation equipment, report the project feasibility study of wind power equipment industry competition analysis, wind power generation equipment, wind power equipment industry financial index analysis, industry wind power equipment market analysis and the scale of construction, and the construction conditions of location scheme of wind power generation equipment project uncertainty and risk analysis of the project of wind power generation equipment, analysis of the development trend of wind power equipment industry.
[report]: development and Reform Commission approved the project, the record, the government approved the land, corporate finance, project loans, the application of funds, energy assessment, etc.. The other: the national development and Reform Commission a, B and C qualification.
[report]
Application report of wind power generation equipment
Project proposal for wind power generation equipment
Business plan for wind power generation equipment
Project feasibility study report of wind power generation equipment
Report on the application of funds for wind power generation equipment
Energy saving evaluation report of wind power generation equipment
Wind power equipment industry Market Research Report
Analysis report on investment value of wind power generation equipment project
Risk analysis report of wind power plant project investment
Wind power generation equipment industry development forecast analysis report
[contact] Zhang Feng
[telephone] 15905416720 (24 hours)
[network online] QQ:1084122939 (WeChat same number)
[production unit] Beijing's Sindh International Information Consulting Co. Ltd.
[service phone] 010-52785534
[delivery time] 3-5 working days
[form] text analysis, data comparison, statistical chart
[report] WORD format format format PDF fine print edition binding
[report price] this report for the project report, the price according to the specific requirements of consultation, welcome to inquire.
[report]
Beijing's Sindh International Information Consulting Co. Ltd is a professional preparation of all the feasibility study report, business plan, project proposal, project report and so on. After continuous development and improvement, we have covered agriculture, industry, new energy, medical support combined, photovoltaic, aquaculture, industrial park, logistics park, garbage disposal, sewage treatment, big data, technological expansion, construction, metallurgy, chemical, electrical, household appliances, steel and other more than and 40 industries, online sales all kinds of the feasibility report of nearly million copies.
This report is aimed at the special report on the industry investment feasibility research and consulting service, this report is a personalized service report, we will according to the specific requirements of different types and different sectors of the proposed project, revised report directory, and based on this catalog to improve the industry data and content analysis, for the enterprise, the project launched, provide full service to guide capital financing.
The research report based on the market demand and supply of resources, the scale of construction, technological process, equipment selection, environmental impact, financing, profitability and other aspects based on the experience of experts on project economic benefits and social benefits of scientific forecast, to provide customers with a full. Face, objective and reliable project investment value evaluation and project construction process, etc..
Feasibility study report outline (specific to customer requirements)
In Chapter one.
1.1 wind power equipment project background
1.1.1 wind power generation equipment project name
1.1.2 construction property
1.1.3 wind power equipment project contractors
1.1.4 wind power plant project construction site
1.1.5 research work basis
1.1.5.1 national policy, industry development planning, regional development planning
1.1.5.2 wind power equipment project units to provide basic information
1.1.6 research scope
1.2 feasibility study conclusion
1.2.1 market forecast and project size
A brief analysis of 1.2.1.1 market demand
1.2.1.2 target market determination
1.2.1.3 product solutions and sales revenue forecast
1.2.1.4 wind power equipment projects proposed scale
1.2.2 raw materials, fuel and power supply
1.2.3 site
1.2.4 environmental protection
1.2.5 factory organization and personnel work
1.2.6 wind power equipment project construction progress
1.2.7 investment estimate and fund raising
1.2.7.1 investment estimate
1.2.7.2 financing
1.2.8 wind power plant project financial and Economic Review
1.2.9 wind power equipment project comprehensive evaluation conclusion
Table 1.3 main technical and economic indicators
Table 1-1 main technical and economic indicators table
The second chapter is the background of the project and the necessity of the investment.
2.1 background of the project of wind power equipment
2.1.1 industry policy background
2.1.2 wind power equipment project background
2.2 the need for investment
The construction of 2.2.1 wind power equipment project is the need of the market.
2.2.2 wind power equipment projects are needed to increase local fiscal revenue
2.2.3 wind power equipment project is to improve the local people's income and maintain social prosperity and stability of the needs of
2.2.4 wind power equipment project is the need of enterprise's own development
The third chapter market analysis
3.1 overall market trends
3.2 market size
3.3 market forecast
3.4 competitive analysis of products
The fourth chapter construction conditions and site selection
4.1 overview of wind power plant project area
4.1.1 profile
4.1.2 selection principle
4.1.3 site summary
Brief introduction of 4.1.4 industrial concentration area
4.2 factory (field) site construction conditions
4.2.1 geography. climate
4.2.2 resources overview
4.2.3 traffic location
4.2.4 social and economic conditions
4.3 major raw and auxiliary materials supply
4.3.1 main raw material
4.3.2 fuel power
The fifth chapter engineering technology program
5.1 wind power generation equipment project
5.2 production technology solutions
5.2.1 technology source
5.2.2 production process
5.3 project plan
5.3.1 civil engineering
5.3.1.1 design specifications and standards
5.3.1.2 design principles
5.3.1.3 engineering survey
5.3.1.4 building requirements and effects
5.3.2 plant protection facilities and green
5.3.3 road parking lot
The sixth chapter general transportation and public assistance project
6.1 general layout and transportation
Key points of 6.1.1 general layout plan and description
6.1.1.1 design basis and basic data
The principle of 6.1.1.2 layout
6.1.2 general layout plan
6.2 inside and outside transport
6.2.1 transport volume
6.2.2 means of transport and transport
6.2.2.1 outside the plant transport
6.2.2.2 in plant transportation
6.3 public utilities
6.3.1 water supply and drainage engineering
6.3.1.1 design basis
6.3.1.2 design scope
6.3.1.3 water supply and water use
6.3.1.4 drainage
6.3.2 Electrical Engineering
6.3.2.1 design basis
6.3.2.2 design scope and content
6.3.2.3 load level and the determination of power supply
6.3.2.4 low voltage distribution design
6.3.2.5 lightning protection and electrical safety grounding system
6.3.2.6 integrated wiring system design
6.3.2.7 cable TV system design
6.3.3 HVAC
6.3.4 maintenance
6.3.5 communication facilities
The seventh chapter energy saving
7.1 energy standards and energy efficiency standards
7.1.1 principles and standards
7.1.2 specification and basis
7.2 energy consumption status and energy consumption index analysis
7.3 energy saving measures
7.3.1 building energy efficiency
7.3.2 power saving measures
7.4 water saving measures
The eighth chapter environmental protection
8.1 implementation standards for environmental protection
8.1.1 environmental quality standards
8.1.2 pollutant emission standard
8.2 environmental and ecological status quo
8.3 major pollution sources and pollutants
Influence of 8.3.1 construction period on Environment
8.3.1.1 atmospheric environmental impact analysis
8.3.1.2 water environmental impact analysis
8.3.1.3 sound environment impact analysis
Analysis on the impact of 8.3.1.4 solid waste
Impact of 8.3.2 operation on the environment
8.3.2.1 water environmental impact analysis
8.3.2.2 atmospheric environmental impact analysis
Analysis of the environmental impact of 8.3.2.3 noise
Analysis on the impact of 8.3.2.4 solid waste
8.4 environmental protection measures
Pollution prevention and control measures during the construction period of 8.4.1
Pollution control measures during 8.4.2 operation
8.4.2.1 wastewater treatment program
8.4.2.2 waste gas treatment program
8.4.2.3 noise control scheme
8.4.2.4 solid waste management program
8.4.2.5 plant greening measures
8.5 environmental monitoring and Environmental Protection Agency
8.6 public participation
8.7 environmental impact assessment
Labor safety and health and fire protection in the ninth chapter
9.1 labor safety and health
9.1.1 design basis
9.1.2 labor safety
9.1.2.1 plant layout and transportation safety
9.1.2.2 fire and explosion protection
9.1.2.3 anti machine injury, hurt
9.1.2.4 electrical accident prevention
9.1.2.5 lightning protection and grounding
9.1.3 occupational health
9.1.3.1 anti noise
9.1.3.2 cooling, cold proof and anti temperature
9.1.3.3 reduces labor intensity
9.1.3.4 protection for women workers
9.2 fire safety
Main basis for 9.2.1 design
9.2.2 fire principles and measures
Organization structure and human resource allocation in the tenth chapter
10.1 organization
10.2 human resource allocation
10.2.1 labor force
10.2.2 personnel source
10.2.3 personnel training
10.3 project management
10.3.1 financial management
10.3.2 equipment and material management
10.3.3 Engineering Management
The eleventh chapter wind power equipment project management and implementation progress
11.1 wind power equipment project construction management
11.2 wind power equipment project supervision
11.3 project construction schedule and schedule for wind power generation equipment
The twelfth chapter wind power equipment project investment estimation and fund raising
12.1 investment estimate
12.1.1 basis
12.1.2 preparation method
Total investment in 12.1.3 construction
12.1.3.1 engineering cost
12.1.3.2 other costs of construction projects
12.1.3.3 engineering construction preparation fee
12.1.3.3 construction period interest
12.1.4 liquidity estimates
12.1.4.1 estimate basis
12.1.4.2 estimation results
12.1.5 investment estimation results
12.2 fund raising
12.3 investment plan
12.3.1 investment plan
12.3.2 loan repayment plan
12.4 investment estimate form
See the economic schedule:
Construction investment estimate;
Construction period interest estimate;
Liquidity estimate;
Capital raising and use plan.
The thirteenth chapter of the project tender
13.1 general
13.2 wind power equipment projects using the tender procedures
13.3 bidding content
13.4 basic information of the tender table
The fourteenth chapter financial evaluation of wind power equipment project
14.1 financial evaluation basis and scope
14.2 basic data and parameter selection
14.3 financial benefit and cost estimate
14.3.1 annual sales revenue estimate
Total cost and cost estimation of 14.3.2 products
14.3.3 profit and profit distribution
14.4 financial analysis
14.4.1 financial profitability analysis
14.4.2 financial viability analysis
14.5 financial solvency analysis
14.6 uncertainty analysis
14.6.1 break even analysis
14.6.2 sensitivity analysis
14.7 financial appraisal conclusion
The fifteenth chapter wind power equipment project risk analysis
15.1 identification of risk factors
15.2 risk assessment
15.3 risk countermeasure research
The sixteenth chapter conclusion and suggestion of wind power equipment project
16.1 conclusions of wind power generation equipment project
16.2 suggestions for wind power generation equipment
The seventeenth chapter schedule
Service flow:
1 pre contact with customers, understand the basic situation of the project;
2 the two parties to negotiate the preparation fee, and sign the business contract;
3 we keep a secret commitment (or sign a confidentiality agreement), the other party to submit information;
4, we set up a research group, the professional preparation of writing;5, the delivery of the first draft, customer audit, combined with the improvement of views to improve the treatment;
6, complete the final version and print and bind the follow-up work.
Specific details of the service, please call: 15905416720 (Zhang Jingli