Beijing's Sindh International Information Consulting Co. Ltd.

Member Level: Register Member
Enterprise Nature: Private
Operation Mode: Service Suppliers
Location: Fengtai District Beijing City China
Authentication Information:

Product Details

A report on the feasibility of a 100 ton flat copper wire project

Price 5000
Unit 中投信德
Yield /年
Place of Production 北京
Product Category 其它
Delivery Time

Product Detail Parameters

Product Description

An outline of the feasibility study report of a 100 ton flat copper wire project
Core tip: annual output of 100 tons of copper flat feasibility study project, with an annual output of 100 tons of flat copper project investment environment, with an annual output of 100 tons of copper flat background and development projects, the necessity of an annual output of 100 tons of flat copper wire of the construction of the project, with an annual output of 100 tons for the report of feasibility study on flat copper wire project, with an annual output of 100 tons of flat copper wire industry competition pattern analysis of reference, an annual output of 100 tons of flat copper wire industry financial index analysis, an annual output of 100 tons of flat copper wire industry market analysis and the scale of construction, with an annual output of 100 tons of flat copper wire construction conditions and site plan, with an annual output of 100 tons of flat copper wire project uncertainty and risk analysis, the annual output of 100 tons of flat copper wire industry development trend.
The report uses: the development and Reform Commission approvals approval, filing, land approval, enterprise financing, application for subsidized funds, investment investment, energy saving assessment, etc. The other: the national development and Reform Commission a, B and C qualification.
[contact] Zhang Feng
[contact] 15905416720 (24 hours to answer)
[network online] QQ:1084122939 (WeChat same number)
Beijing CIC Sinda International Information Consulting Co., Ltd.
[service phone] 010-52785534
(delivery time) 3-5 working days
[expression] text analysis, data comparison, statistical chart
[report] WORD format format format PDF fine print edition binding
[report price] this report is the report of the project, the price is negotiated according to the specific requirements, and the call is welcome.
[report]
Beijing CIC International Information Consulting Co., Ltd. specializes in a variety of feasibility studies, business plans, project proposals, project reports, and so on. After continuous development and improvement, we have covered agriculture, industry, new energy, medical support combined, photovoltaic, aquaculture, industrial park, logistics park, garbage disposal, sewage treatment, big data, technological expansion, construction, metallurgy, chemical, electrical, household appliances, steel and other more than 40 industries, online sales all kinds of the feasibility report of nearly million copies.
This report is aimed at the special report on the industry investment feasibility research and consulting service, this report is a personalized service report, we will according to the specific requirements of different types and different sectors of the proposed project, revised report directory, and based on this catalog to improve the industry data and content analysis, for the enterprise, the project launched, provide full service to guide capital financing.
The research report based on the market demand and supply of resources, the scale of construction, technological process, equipment selection, environmental impact, financing, profitability and other aspects based on the experience of experts on project economic benefits and social benefits of scientific forecast, to provide customers with a full. The advisory opinion of the objective, objective and reliable evaluation of the project investment value and the process of project construction.
The outline of the feasibility study report (specifically adjusted according to customer requirements)
Chapter one chapter
Project background of 100 tons flat copper wire in 1.1
1.1.1 project name of 100 tons flat copper wire
The construction nature of 1.1.2
1.1.3 annual production unit of 100 tons flat copper wire project
1.1.4 annual production of 100 tons flat copper line project construction site
1.1.5 research work basis
1.1.5.1 national policy, industry development plan and regional development plan
1.1.5.2 basic information provided by the 100 tons flat copper wire project unit
1.1.6 research scope
1.2 feasibility study conclusion
1.2.1 market forecast and project scale
A brief analysis of the demand of 1.2.1.1 Market
The determination of 1.2.1.2 target market
1.2.1.3 product plan and sales revenue forecast
1.2.1.4 annual production of 100 tons flat copper line project scale
1.2.2 raw materials, fuel and power supply
1.2.3 site
1.2.4 environmental protection
1.2.5 factory organization and personnel work
Project construction progress of 100 tons of flat copper wire per year in 1.2.6
1.2.7 investment estimation and financing
1.2.7.1 investment estimation
1.2.7.2 financing
1.2.8 annual production of 100 tons flat copper line project financial and Economic Review
Comprehensive evaluation of 100 tons flat copper line project in 1.2.9
1.3 main technical and economic indicators
Table 1-1 table of main technical and economic indicators
The second chapter of the project background and the necessity of investment
The background of the 100 tons flat copper wire project in 2.1
2.1.1 industry policy background
2.1.2 project background of 100 tons flat copper wire
2.2 the necessity of investment
The construction of the 100 tons flat copper wire project in 2.2.1 is the need of the market
2.2.2's annual production of 100 tons of flat copper wire is a need to increase local fiscal revenue
The annual production of 100 tons of flat copper wire for 2.2.3 is a need to improve local people's income and maintain social prosperity and stability.
The annual production of 100 tons of flat copper wire for 2.2.4 is the need of the enterprise's own development
The market analysis of the third chapter
3.1 market overall trend
3.2 market scale
3.3 market forecast
Analysis of the competitiveness of 3.4 products
The fourth chapter construction conditions and site selection
A survey of 100 tons flat copper wire project area in 4.1
4.1.1 profile
4.1.2 selection principle
4.1.3 site overview
Introduction of 4.1.4 industrial concentrated area
Construction conditions of the 4.2 plant (field) site
4.2.1 geography. climate
Overview of 4.2.2 resources
4.2.3 traffic location
4.2.4 social and economic conditions
4.3 main raw and auxiliary materials supply
4.3.1 main raw materials
4.3.2 fuel power
The fifth chapter of engineering technical scheme
The composition of 100 tons flat copper wire in 5.1
5.2 production technology scheme
5.2.1 technology source
5.2.2 production process
5.3 project plan
5.3.1 civil construction
5.3.1.1 design specifications and standards
5.3.1.2 design principles
General situation of 5.3.1.3 Engineering
5.3.1.4 building requirements and effects
Protection facilities and greening of 5.3.2 factory
5.3.3 road parking lot
The sixth chapter general map transportation and public assistance project
6.1 general map transportation
General layout of 6.1.1The main points and instructions of the scheme
6.1.1.1 design basis and basic information
The principle of general layout of 6.1.1.2
General layout scheme of 6.1.2
6.2 Field Transportation
6.2.1 transport volume
6.2.2 transport tools and modes of transport
6.2.2.1 out of plant transportation
6.2.2.2 factory transportation
6.3 public auxiliary engineering
6.3.1 water supply and drainage project
6.3.1.1 design basis
6.3.1.2 design scope
Water supply source and water consumption of 6.3.1.3
6.3.1.4 drainage
6.3.2 Electrical Engineering
6.3.2.1 design basis
6.3.2.2 design scope and content
Determination of 6.3.2.3 load grade and power supply
6.3.2.4 low voltage distribution design
6.3.2.5 lightning protection and electrical safety grounding system
Design of 6.3.2.6 integrated wiring system
Design of 6.3.2.7 cable TV system
6.3.3 HVAC
6.3.4 maintenance
6.3.5 communication facilities
The seventh chapter energy saving
7.1 energy use standards and energy saving specifications
7.1.1 principles and standards
7.1.2 specification and basis
Analysis of 7.2 energy consumption status and energy consumption index
7.3 energy saving measures
7.3.1 building energy saving
7.3.2 electricity saving measures
7.4 water saving measures
The eighth chapter environmental protection
8.1 implementation standards for environmental protection
8.1.1 environmental quality standard
8.1.2 pollutant discharge standard
8.2 environment and ecological status
8.3 main pollution sources and pollutants
The impact of the construction period of 8.3.1 on the environment
Analysis of the influence of 8.3.1.1 atmospheric environment
Analysis of the influence of 8.3.1.2 water environment
Analysis of the influence of 8.3.1.3 acoustic environment
Analysis of the influence of 8.3.1.4 solid waste
The impact of the 8.3.2 operating period on the environment
Analysis of the influence of 8.3.2.1 water environment
Analysis of the influence of 8.3.2.2 atmospheric environment
Analysis of the influence of 8.3.2.3 noise environment
Analysis of the influence of 8.3.2.4 solid waste
8.4 environmental protection measures
Pollution prevention measures in 8.4.1 construction period
Pollution prevention measures in 8.4.2 operation period
8.4.2.1 wastewater treatment scheme
8.4.2.2 waste gas treatment scheme
8.4.2.3 noise control scheme
8.4.2.4 solid waste management program
The greening measures of 8.4.2.5 whole plant
8.5 environmental monitoring and environmental protection institutions
8.6 public participation
8.7 environmental impact assessment
The ninth chapter of labor safety and health and fire protection
9.1 labor safety and health
9.1.1 design basis
9.1.2 labor safety
The layout of 9.1.2.1 factory and the safety of transportation in the factory
9.1.2.2 fire proof and explosion-proof
9.1.2.3 injury prevention and injury
9.1.2.4 electric accident prevention
9.1.2.5 lightning protection and grounding
9.1.3 occupational health
9.1.3.1 noise prevention
9.1.3.2 cooling, cold proof and anti temperature
9.1.3.3 reduces labor intensity
9.1.3.4 women workers protection
9.2 fire safety
The design of 9.2.1 is mainly based on
9.2.2 fire protection principles and measures
The tenth chapter organization and the allocation of human resources
10.1 organization
10.2 human resource allocation
10.2.1 labor force
10.2.2 personnel source
10.2.3 personnel training
10.3 project management
10.3.1 financial management
Material management of 10.3.2 equipment
10.3.3 Engineering Management
Eleventh chapter project management and implementation progress of 100 tons of flat copper wire
Project construction management of 100 tons flat copper wire in 11.1
Project supervision of 100 tons flat copper wire in 11.2
Construction period and schedule of 100 tons flat copper wire in 11.3
Twelfth chapter investment estimation and fund raising of 100 tons of flat copper wire
12.1 investment estimation
The basis of 12.1.1
12.1.2 compilation method
12.1.3 construction of total investment
12.1.3.1 engineering cost
12.1.3.2 construction of other costs
12.1.3.3 project construction preparation fee
12.1.3.3 interest in construction period
12.1.4 liquidity estimate
12.1.4.1 estimation basis
12.1.4.2 estimation results
12.1.5 investment estimation results
12.2 financing
12.3 investment use plan
12.3.1 investment use plan
12.3.2 loan repayment plan
12.4 investment estimate
See the economic schedule in detail:
Construction investment estimates;
The interest estimate form for the construction period;
Liquidity estimates;
Plan for financing and use of funds.
The thirteenth chapter project bidding scheme
13.1 general rule
The bidding procedure adopted for the 100 tons flat copper wire project in 13.2
13.3 tendering content
13.4 basic tendering table
The financial evaluation of the fourteenth chapter 100 tons flat copper wire
14.1 basis and scope of financial evaluation
14.2 basic data and parameter selection
14.3 financial benefit and cost estimation
14.3.1 sales revenue estimate
Total cost and cost estimation of 14.3.2 products
14.3.3 profit and profit distribution
14.4 financial analysis
Analysis of 14.4.1's financial profitability
Analysis of the financial viability of 14.4.2
14.5 analysis of financial solvency
14.6 uncertainty analysis
Analysis of profit and loss balance of 14.6.1
14.6.2 sensitivity analysis
14.7 conclusion of financial evaluation
Analysis on the risk of 100 tons of flat copper wire in fifteenth chapters
15.1 identification of risk factors
15.2 risk assessment
Research on 15.3 risk countermeasures
The conclusion and suggestion of the sixteenth chapter 100 tons flat copper wire
The conclusion of 100 tons flat copper wire project in 16.1
Proposal for 100 tons of flat copper wire in 16.2
Appendix to the seventeenth chapter
Service flow:
1. contact with the customer early to understand the basic situation of the project;
2. the two parties negotiate the compilation fee and sign the business contract.
3. our confidentiality commitment (or the signing of the confidentiality agreement), the other party submits the information;
4. We have set up a research group to make a professional compilation.
5, delivery of the first draft, customer audit, combined with amendments to improve the treatment;
6. Complete the finalization and print the bindingFollow up work.
For details of the service, please call: 15905416720 (Zhang Jingli