Product Details

Carbon steel tank horizontal and vertical storage tank maintenance maintenance period

Price 617
Unit
Yield 400/年
Place of Production 浙江金华
Product Category 制药类(反应器、混合槽、贮罐、缓冲罐等)
Delivery Time 30天

Product Detail Parameters

型号CG-6000 直径6000

Product Description

Carbon steel tank horizontal and vertical storage tank maintenance maintenance deadline Tel hpxiao mobile phone 15857012567.
In order to ensure the safe production and safe operation of equipment, improve the service life of the equipment and efficiency of mechanical equipment operation shall conduct regular inspection and maintenance, to prevent mechanical failure and affect production, or mechanical accident casualties, actual production, safety procedures and safety maintenance management system, through the study and formulate the tank annual maintenance tank.
Storage tank maintenance cycle is generally: 60-120 days of repair, overhaul 12 months. Medium repair: eliminate run, run, drip, leak
Clean or replace the level gauge to repair or replace the inlet, outlet and sewage valve to clean up the cooling water coil. Check and repair the safety valve vent arrester. Repair of anti-corrosion layer and insulation layer. Overhaul: including repair projects in the repair of internal parts of the tank, found to have cracks, severe corrosion and other parts, the corresponding repair or replacement of the barrel section. Repair can be repaired using polymer composites. According to the internal and external inspection requirements, and after the repair or replacement of the cylinder after required leakage test or hydraulic test. Comprehensive in addition to embroidered insulation. To deal with other problems found in the internal and external inspection of storage tank