Qdsunyada

Member Level: Register Member
Enterprise Nature: Private
Operation Mode: Fabricators
Location: chengyang district Qingdao City Shandong Province China
Authentication Information:

Product Details

Water spray exhaust gas purification tower, exhaust gas purification washing tower installation

Price 12
Unit
Yield 2000000/年
Place of Production 青岛
Product Category 其他
Delivery Time 2天

Product Detail Parameters

规格 定做

Product Description

Water spray exhaust gas purifying tower, installation requirement of exhaust gas purification washing tower
Inspection and maintenance content:
1: remove the surface dust, dirt.
2: spray head, with or without clogging.
3: clear the tank has no precipitation blockage, and clean up records, easy to customize the next clean-up time.
4: To observe the Raschig ring surface might be heavier stains, if required to take place in large area water tank with a neutralizing agent to remove surface stains.
5: according to exhaust odor or data to determine whether to replace activated carbon, activated carbon can be used in the sun after exposure, so that renewable.
6: check whether the pump abnormal sound, loose and plug.
Installation notes
1 the equipment should be installed on the ground above the ground 100M above the concrete, pumps, fans should be required for another concrete basis.
2 transport installation should pay attention to protection, shall not touch damaged body and parts.
3 the equipment factory, the factory according to the specific circumstances, using sub packaging and transportation, from the factory to send to the site installation and commissioning.
4 installation and operation of the equipment in the outdoor, winter response to the bottom part of the pool antifreeze.
5 the bottom of the equipment pool liquid marked, before use must be marked by liquid level into the absorption liquid. Should pay attention to the use of supplementary absorption liquid
6 should be used to open the circulating water pump for 2-3 minutes, open the blower, shutdown, stop blower for 1-2 minutes, then stop the pump.
7 should be based on the use of regular inspection at the bottom of the tower inside the pool of liquid acid concentration and discharge outlet gas purification degree, beyond the standard, should be replaced in a pool at the bottom of the absorption liquid.
8 equipment a year and a half to two years should be a overhaul, check disk spray tube and filler packing situation, and its cleaning