Qdsunyada

Member Level: Register Member
Enterprise Nature: Private
Operation Mode: Fabricators
Location: chengyang district Qingdao City Shandong Province China
Authentication Information:

Product Details

Water spraying waste gas purification tower, organic waste gas spray cleaning device

Price 11
Unit
Yield 20000000/年
Place of Production 青岛
Product Category 其他
Delivery Time 2天

Product Detail Parameters

规格 定做

Product Description

Water spraying waste gas purifying tower, organic waste gas spraying and purifying device
Characteristics of spray purification tower:
1.PP low noise, smooth operation, simple operation, convenient;
2 professional for acid gas in electroplating industry and more than and 5 surface treatment produced by neutralization treatment, using high quality PP plate, the air volume can be adjusted with random. 3 external dimensions: according to the customer site requirements PP spray purification tower alkali neutralization tower size.
Qingdao San Da environmental production of horizontal spray purification tower, air flow direction and drug spraying direction are crossed, with compact structure, greatly reduces the height of the system, the single volume reached 500 cubic meters per minute or more. This kind of washing tower filler made of PP material, shape of multi tooth shape of TELLERTTE, void ratio reached 95%, the specific surface area of 90 square meters per cubic metre; in addition to water filling made of PP material, TELLERTTE shape is circular shape, void ratio reached 95%, the specific surface area of 180 square meters per cubic metre. Sprinkler head with PP120 degree rotation without clogging nozzle. There are no metal components in the system. To this end, the whole system has a high acid and alkali resistance; resistance to the whole system is less than 40mmAq, greatly saving energy consumption. this
The spray purification tower can make two layers of washing and processing of different pollution factors with different agents.
Inspection equipment
(1) the tower outlet non blocking, water flow;
(2) to ensure that there is no debris, no ash accumulation; under the circumstances, it is recommended that a week to clean up the sewage outfall;
(3) ensure the additive condition; tower bottom pH control at 7.5-8;
(4) check the water storage tank, replenish the caustic chemicals;
(5) check whether the pump motor heating, abnormal noise, the pump body with no seepage.
When the equipment fails to find the cause of the fault, the individual can solve the problem should be taken immediately; individuals can not be resolved, should promptly notify the responsible personnel and operators. When the need to stop the operation of equipment for maintenance, should first stop the fan, the last stop circulating pump.
Common problems and solutions are as follows:
1, check the sewage outlet is blocked, the nozzle is blocked, whether the pipeline is smooth, the pump is running normally.
2, should check the inner wall of the tower and the packing layer with no agglomerate, if the above situation, should be cleared.
Spray tower is a kind of chemical waste gas treatment equipment in the form of liquid absorption. Widely used in electroplating, chemical, metallurgy, electronics, medicine, textile, experimental instrument, and other industries, can be generally used for fog governance, deodorization, dust and other industrial environments. The pickling process is especially suitable for various materials, to produce in the process of acid pickling process (H2S04), hydrogen chloride (HCL) gas and hydrogen fluoride (HF) gas, chromium acid (CrO3), hydrogen cyanide (HCN) gas, hydrogen sulfide (H2S), ammonia (NH3), water soluble alkali vapor etc. gas purification rate of more than 95%, acid gas purification and reverse flow packed tower gas-liquid two-phase equipment. The mist purification tower by using one to three grade, spray absorption treatment, shell using PP/ glass steel / carbon steel / stainless steel and other materials, the main structure is provided with a circulating water tank, filler layer, spray layer, structure layer, fog screen except manhole, tank in gas-liquid contact fully, exhaust gas purification after absorption much lower than the national emission standards, and the equipment has the advantages of convenient operation, easy installation and maintenance, convenient maintenance, long service life, small area. It is the ideal waste gas treatment equipment at present