The internal price parameters of Jiangxi acid mist emissions spray tower manufacturers
Qingdao San Da environmental protection equipment Co., Ltd. is a professional engaged in environmental protection equipment R & D and manufacturing environment and environmental resources optimization application of high-tech industrial company, involved in wastewater, waste gas deodorizing field engineering, solid waste treatment engineering, digital information technology systems integration and city garbage disposal and comprehensive utilization of technology and product development, engineering design, the implementation of the project and equipment manufacturing, through careful design and strict quality control system and perfect production technology, the company has become mainstream technology in the industry. The practical application of dry sludge incineration equipment, water disinfection equipment, air pollution control engineering in the fields of animal husbandry, electronics manufacturing, medical, pharmaceutical, food processing, water treatment industry, such as odor control and protection of air quality, the removal of water borne pathogenic micro-organisms and toxic chemicals and kill organic compounds. We have a professional R & D and experienced technical staff, as a solution to a professional Equipment Manufacturing Company to provide customers with professional engineering is advanced, efficient and reliable, we have the ability to design basis for you the best quality products and services, including design is determined by the sampling and analysis of water, waste water and air flow level and complexity. We provide training, technical support, safety and reliability system procedures, maintenance of all our company's equipment products.
Qingdao San Da environmental technology limited production of waste, waste gas scrubber, waste gas purification tower, spray tower, waste gas treatment equipment, waste gas absorption tower has the following characteristics:
1 the efficiency of dust removal and desulfurization is high, the desulfurization efficiency can reach to 85% when using alkaline washing water;
2 equipment area is small, easy to install;
3 water consumption, low power consumption indicators;
4 corrosion resistance, no wear, long service life;
5 the equipment is reliable and easy to maintain.
First, job responsibilities
In order to strengthen the management of waste gas treatment facilities, it is necessary to strictly implement the environmental protection law of the People's Republic of China.
Our technical staff will hand over to the owner and inform the following
Should comply with the rules and regulations of the factory.
Induction time shall not leave.
Familiar with the process and principle of waste gas treatment facilities, familiar with electrical control and operation.
To Caution!, should wear insulated shoes approach operation.
Found that the handling of the accident due to the operation of the accident, should take measures to promptly report to the leadership of the factory.
Two, operating procedures
Operator to check the operation of the equipment, to ensure that everything is normal, and open the main power supply.
Preparation of sodium hydroxide treatment agent.
Control of film base, according to the wastewater concentration adjusting agent flow, the waste water pH in a circular pool at 7.5-8.
Running device operation
(1) to determine the circulating water level reached the lowest level shall not be lower than the standard: suction, the highest water level shall not be higher than the feeding port and the water outlet (float water level control, level meter also can visually see the water tower);
(2) check whether the normal direction of the impeller pump shaft rotation is normal: (do not let water pump blade wheel spin);
(3) to determine the smooth flow of sewage outfall;
(4) all checks are ready to start the fan.
Every 6 hours in the course of operation of equipment for the processing system for a tour of inspection, inspection of tower outlet, sewage outfall, water pump, and found that the problem should be timely treatment;
Three, inspection equipment
(1) the tower outlet non blocking, water flow;
(2) to ensure that there is no debris, no ash accumulation; under the circumstances, it is recommended that a week to clean up the sewage outfall;
(3) ensure the additive condition; tower bottom pH control at 7.5-8;
(4) check the water storage tank, replenish the caustic chemicals;
(5) check whether the pump motor heating, abnormal noise, the pump body with no seepage.
When the equipment fails to find the cause of the fault, the individual can solve the problem should be taken immediately; individuals can not be resolved, should promptly notify the responsible personnel and operators. When the need to stop the operation of equipment for maintenance, should first stop the fan, the last stop circulating pump.
Note: due to the different quality and specifications of the equipment, the company will be based on customer demand, professional design and quotation, there is a need for customers, please contact the direct telephone