Qdsunyada

Member Level: Register Member
Enterprise Nature: Private
Operation Mode: Fabricators
Location: chengyang district Qingdao City Shandong Province China
Authentication Information:

Product Details

Liaocheng acid waste gas spray tower which production factory

Price 10
Unit
Yield 2000000/年
Place of Production 青岛
Product Category 其他
Delivery Time 2天

Product Detail Parameters

规格 根据风量定做

Product Description

Liaocheng acid waste gas spray tower which manufacturers
Device description;
As a new type of spray absorption equipment, it has been widely used in the purification of waste gas. The concept of fluidized bed is developed to the vapor liquid mass transfer equipment, so that the packing in the spray tower is in the state of fluidization, so that the mass transfer process can be enhanced. Its characteristics are: high gas velocity, large capacity, light weight, relatively uniform distribution of liquid vapor, not easy to be blocked by solid and viscous materials. Especially since the column turbulence strongly, so the quality and energy transfer can be enhanced, which can greatly reduce the tower diameter, reduced height. The tower volume is large, empty tower gas velocity of 1.5 ~ 6.0m/s, 20 ~ 110m3/ spray density (M2 - H), the pressure loss of 1500 ~ 3800Pa, the fog device adopts a swirl plate demister in the washing tower, the gas produced by plate rotation, using centrifugal force to remove mist in addition, the separation efficiency can reach 98%-99%, and has the advantages of simple structure low pressure drop.
Installation notes:
1, the main body of the spray equipment, water pump, blower fan is recommended to install on the basis of the concrete, the equipment uses expansion bolt fixed.
2, if the installation and operation of the equipment in the outdoor, winter temperatures should be considered when the bottom of the water tank to do antifreeze treatment.
3, the water tank has a liquid level mark, before use must be injected into the absorption liquid level mark. The use of the process should pay attention to the timely addition of absorbing liquid.
4, the use of the first cycle of the pump should be opened, and then start the blower, the first stop should stop when the blower for 1-2 minutes, then stop circulating water pump.
5, according to the use of the periodic inspection of the equipment tank water depth and exhaust gas purification degree, should be in accordance with the operation of the equipment in time to replace the bottom of the pool water absorption.
6, the equipment for a year and a half to two years should be a repair, check disk
Packing of spray pipe and packing, and cleaning.
Structure description;
This equipment is divided into single tower and Twin Towers. The circular tower body is connected by a flange. The utility model is composed of a liquid storage tank, a tower body, an air inlet section, a spray layer, a packing layer, a cyclone mist removing layer, a viewing window and an air outlet.
Product characteristics
This product materials produced by PP, polypropylene composition, anti corrosion, anti cracking, abrasion resistance, high strength, good toughness and other advantages. This product is simple installation, long service life, reliable connection.
Maintenance and maintenance
The agency shall conduct the inspection and maintenance on the 30 day after commissioning.
Details Tel: 13173219136 Hou Miao