Henanguanzhongrenengshebei

Member Level: Register Member
Enterprise Nature: Private
Operation Mode: Fabricators
Location: Zhongyuan District Zhengzhou City Henan Province China
Authentication Information:

Product Category

Product Details

How is the steam generator installed

Price 2563
Unit
Yield 1000/年
Place of Production 河南郑州
Product Category 其他
Delivery Time 3天

Product Detail Parameters

技术咨询热线 13592649186

Product Description

How to install the electric steam generator steam generator is also called free type small electric steam boiler, micro electric steam boiler, is a kind of automatic water supply, heating, mini boiler while continuously producing low pressure steam, a small water tank, water pump, control operating system complete integration, without complicated installation, as long as the power supply can be connected to water and.
How to install steam generator?
First, we need to first install the wire, you receive a full automatic steam generator, open the front door of the box can see some of the internal structure, according to the structure to install. On the left side of the chassis, four terminals of the bottom board for the electric wire access point, the wire from the left line through, received a corresponding connection point on it, please cable according to the corresponding specifications of your choice of power equipment.
Second, to install water pipes. In the back of the machine you can clearly see the water inlet pipe structure, pipe and machine only need to be connected with water inlet can use 21.3mm diameter pipe thread G1/2 "). The steam pipe is connected with the main steam valve, using diameter 26.7mm pipe thread G3/4). The use of DN20 G3/4 outfall pipe. Safety valve to be vacant.
Third we can start the trial. Connect the wire, install the water pipe and steam pipe can be tested after the. In the first time, need to disconnect the power, open the drain valve and steam outlet valve, air screw open water pump head, the machine internal residual water draining machine factory: due to the early commissioning, remaining part of the steam machine residue in the pipeline, the fake gas is condensed into water, will lead to the first when in use, the water can not be pumped into the tank. Therefore, this step is needed.
Also note that when used for the first time, to discharge the air screw installed, close the drain valve and steam outlet valve, close the box is communicated with tap water, turn on the power switch can be directly used. This machine has power, then open the switch, the pump lights began to pump water tank, water tank reaches a certain capacity, heating lamp, electric heating tube heating to generate steam, pressure rising. The tank water level close to the upper limit of high water level indicator lights and stop pump water, steam pressure reaches the set value automatically suspended machine

Product Performance

河南煤业化工集团有限责任公司康苏煤矿供暖项目、中铁一局、七局、十五局、二十局、二十二局桥梁项目板材、管桩蒸养项目、贵州镇酒厂车间蒸汽酿酒项目、劲牌酒业酿酒车间蒸汽蒸馏项目、宁夏兰星石油有限公司项目等工程,业绩遍布全国各大省市,凭借着过硬的产品质量和良好的售后服务及相对合适的市场价格赢得了客户的一致好评。