Product Description
Outline of project feasibility study report
The feasibility study report is before making a construction or research project, the project implementation possibility, effectiveness, technical scheme and technical policies for specific, in-depth and detailed technical appraisal and economic evaluation, to determine a good scheme is reasonable in technology, the economy and the best time is written. Write the report. The main purpose of the development and Reform Commission project, the government approved the land grant funds, etc.. A good report is a highly rigorous data report, its format and outline how to write, the following is the standard format: NDRC project (in the construction project feasibility study report preparation for example)
Project feasibility study report (contents can be modified in different industry items)
Core tip: analysis of project investment environment, background and development of the project, the necessity of project construction, analysis of industry competition pattern, the reference industry financial index analysis, market analysis and the scale of construction, site selection and project construction condition, project uncertainty and risk analysis, analysis of industry trends.
A complete research report generally contains more than fifteen chapters, including the following:
The first chapter
The second chapter is the background of the project and the necessity of the investment.
The third chapter market analysis
The fourth chapter construction conditions and site selection
The fifth chapter engineering technology program
The sixth chapter general transportation and public assistance project
The seventh chapter energy saving
The eighth chapter environmental protection
Organization structure and human resource allocation in the tenth chapter
Project management and implementation progress in the eleventh chapter
The twelfth chapter of the project investment estimation and financing; economic schedule: the construction of investment estimate form; construction period interest rate estimate table; flow capital estimate table; fund raising and use plan table.
The thirteenth chapter of the project tender
The fourteenth chapter of the project financial evaluation
The fifteenth chapter project risk analysis
The sixteenth chapter is the conclusion of the project and suggestions
The seventeenth chapter schedule
1, tourism and leisure entertainment theme park project location map
2, the main process flow chart
3, the organizers of the financial statements for the past 5 years
4, tourism and leisure entertainment theme park project construction project required for the transfer of the results of the project and the results of the transfer agreement
5, tourism and leisure entertainment theme park project general layout plan
6, the main civil engineering plan
7, the main technical and economic indicators summary table
8, tourism and leisure entertainment theme park project investment budget
9, economic evaluation of the basic statements and auxiliary statements
10 cash flow statement
11, profit and loss statement
12, the source of funds and the use of tables
13, balance sheet
14, financial foreign exchange balance sheet
15, fixed assets investment estimate table
16, the flow of funds to estimate the table
17, investment plan and fund raising
18, unit production cost estimates
19, fixed assets depreciation expense estimate form
20, the total cost of the estimated cost of the table
21, product sales (business) revenue and sales tax and additional estimates.
The feasibility report requires rigorous, overall co-ordination of the report, usually performed by professional organization system, but the traditional design institute for the preparation of the feasibility report for a long time, low efficiency, another feature is the price high, frequently a report of several million, so the need for more efficient, economic, and good preparation of the feasibility report of the company to prepare such a report