The procurement requirements is nothing more than the material, dimensions, tolerances, stainless steel tube heat exchanger material requirements should be to meet the GB13296 standard, and the relevant requirements of NB/T47019.1, the diameter and wall thickness of the tube of tolerance
一路向东